Air conditioning circulating pump the economical choice of tips: 1 Select the appropriate number of circulating pump, to avoid unnecessary waste of resources. Article 6.1.11 of the Code for Design of Heating, Ventilation and Air Conditioning (GBJ19-87, 2001 edition) stipulates that the number and flow of chilled water pumps (primary pumps) should correspond to the number of chillers and the flow rate under design conditions . Secondary pump settings should be based on the size of the cold water system, the pressure difference between the parallel loop of the degree of difference, conditions of use and regulatory requirements through technical and economic comparison. However, in practical work, designers often fail to conduct a comprehensive technical and economic analysis on the comprehensive disposition of various equipments of the air-conditioning system. As a result, the initial investment of the project and the waste of resources such as the "Malaysian car" are caused. To avoid this phenomenon, the majority of designers in the program design stage should be based on the use of features, peak load time, system characteristics and other conditions, for air-conditioning systems, chillers, circulating pumps, cooling towers and other equipment comprehensive configuration full Technical and economic analysis, with a view to meet the use of functional under the premise of reducing project cost and operating costs. 2, a clear project life and cycle of investment costs. I believe that in the process of circulating water pumps, chillers and other equipment, technical and economic analysis should introduce a concept - engineering life cycle costs. The life cycle cost of a project is the expenses incurred in the process of engineering design, development, construction, use, maintenance and scrapping, that is, the design fee, construction fee, construction fee, maintenance fee and other expenses incurred by the project during its definite life cycle or within the scheduled validity period. Operation and maintenance costs, the sum of scrap recovery fees. Life-cycle costs are also very different for different projects and different project phases (as shown in Figure 3.1). Often, operating and maintenance costs are often greater than the one-time investment in project construction. Therefore, during the technical and economic analysis, it should be made clear that the cost of life cycle includes the cost items, the content and scope of each fee, and their interrelationship in the cost constitutional system, which is very important for our technical and economic comparison. 3, the use of value engineering concepts, and strive to minimum project investment to achieve the necessary use of functions. Value engineering aims to improve the value of a product or a job and seeks to achieve a management technique that reliably realizes the user's desired function with the lowest life-cycle cost through organized and creative work, as expressed in Equation 3.3.1. V = F / C (3.3.1) Where V - the value of the research object F - the function of the research object C - the cost of the research object Value engineering technology has been widely used in R & D, design, construction and other industries, the core idea is to make the product with the lowest life-cycle costs it must have the function. In the air conditioning equipment selection and technical and economic analysis, designers should make full use of value engineering concepts, and strive to achieve the minimum necessary investment in the use of functions. Of course, the current situation, to achieve such a design level will take time, but the majority of designers should work in this direction, with a view to achieve good social and economic benefits. 4, other matters needing attention: â‘ In the air conditioning design should be objective and accurate calculation of cooling load and system resistance, to avoid resulting equipment selection is too large; â‘¡ select the circulating pump, pay attention to the pump operating point shift to the right to protect the pump head changes within the allowable range of normal operation of the system; â‘¢ project life cycle cost and value engineering are good tools for engineering economic evaluation, technical and economic analysis should make full use of them. This article Keywords: pump
China Electric Processor,Mini Mixer For Home-Used,Electric Blender Mixer,Mini Blender Mixer, we offered that you can trust. Welcome to do business with us.
Jiangmen Hongyi Electrical Appliance Manufacturing Co., Ltd. is a professional enterprise which aims at producing household electrical appliances. Our company is located in Jiangmen City, Guangdong Province. We are adjacent to Guangzhou, Shenzhen, Macao and Hong Kong. The transportation is very convenient.
Electric Processor,Mini Mixer For Home-Used,Electric Blender Mixer,Mini Blender Mixer Jiangmen HongYi Electrical Appliance Manufacturing CO.LTD , https://www.hongyiappliances.com
Our company has product development, mould manufacturing, testing, product manufacturing and other departments. We have a professional team to ensure product quality. We provide quality and high performance products for clients. Our company aims to establish good and stable trade relationships with clients. Our products are exported to Southeast Asia, the Middle East and other countries and regions. We have deeply won consumer's trust.
Our main products are food mixers, blenders, electric fans, electric irons, plastic accessories and hardware.
Our company has consistently adhered to the concept of "outstanding quality, affordable price, excellent service". We hope to strengthen economic cooperation with friends from all over the world and create a bright future together.
Air conditioning circulating pump the economical choice of tips