Example of a section mining method applied to a mine

(1) Technical conditions for mining of a copper in Zambia

The average thickness of the ore body is 8 meters (⊥ thickness);

The ore body inclination angle is 30°~90°; the ore and surrounding rock are relatively stable.

The ore body is a long strip of copper deposits.

(2) Elements of the nugget

1 stage height - 40 to 60 meters;

2 Each stage is divided into three sections with a section height of 15 to 20 meters;

3 Each section is divided into a mine and a pillar, and the mine is 35 to 40 meters along the strike;

It is 25 to 45 meters long along the slope and 6 meters wide.

The inter-segmented chiseled top column has a true thickness of 5 meters.

(3) Approved work

(1) From the stage of transporting the roadway to dig the ramp, so that the sections can communicate with each other, and can drive the equipment and materials of the trackless equipment and the trackless vehicles.

(2) Drainage and boring wells – every 100 meters along the strike, a mine-boring well is drilled, and the chute is connected to each section of the transport lane.

(3) Segmented transport flat roads – each section level excavates a section of transport lanes outside the lower disc.

(4) Loading and arranging the roadway—digging a loading and traversing lane every 13 meters from the section of the transportation lane.

(5) Mining pillars and mining roadways—excavating the pillars in the upper part of the section transportation lanes.

(6) Rock drilling and hoisting - drilling and boring in the vein near the upper plate.

(7) The inter-column rock drilling chambers are all excavated outside the lower disc.

(8) The top column rock drilling chamber is excavated outside the lower disc.

(4) Cutting work

(1) Cutting the cross-road – dig the cutting cross-section on one side of the mine, so that the rock-drilling roadway and the pillar-collecting roadway are connected.

(2) Cutting the patio – dig the cutting patio from the top of the trench road to the section of the mine.

(3) Ditching and digging the bottom of the road - the loading and traversing lanes are connected with the sloping and sloping flat roads, and the sloping bottoms are digged in the lower part of the ore body.

(4) Formation of cutting vertical groove - drilling a circular deep hole in the cutting cross-section, cutting the patio as a free surface, and forming a cutting groove after blasting.

(5) Mining work

(1) From the cutting groove to the other side of the mine, carry out the mining work, and make a circular deep hole in the rock drilling alley.

(2) In the trench down the flat alley, the fan-shaped blasthole is drilled, and the upper recovery blasthole is simultaneously blasted.

(3) The ore that has fallen down is transported from the loading and traversing lane with a 3.8 m3 scraper to the nearest chute in the section transportation lane, and slipped into the stage transportation lane to be loaded and transported.

(6) Pillar mining and empty area treatment

When a mining house is finished, immediately pick up the side column and the inclined top column on one side.

(1) The deep hole rock drilling chamber of the mining column is arranged on the side of the cutting crossway to the lower plate.

(2) The deep hole rock drilling chamber of the inclined top column is dig, and the side of the mining column is excavated, corresponding to the central part of the mining room.

(3) The order of returning to the mining column is to first blast the column and release the collapsed ore before blasting the top column. When the top column is blasted, most of the ore that has collapsed from the top column slips into the trench and is released due to the external force throwing action.

PVA Resin Wanwei Brand

Wanwei is an important joint manufacturing enterprise of chemical industry, chemical fiber, building materials and new materials in Anhui Province, with total assets of more than 10 billion yuan and annual sales revenue of more than 8.5 billion yuan. The main business is the R & D, production and sales of polyvinyl alcohol (PVA) and its derivatives. It has an annual production capacity of 350000 tons of polyvinyl alcohol (PVA), 600000 tons of VAC, 120000 tons of refined methyl acetate, 500000 tons of calcium carbide, 40000 tons of high-strength and high modulus PVA fiber, 60000 tons of polyester chips, 140000 tons of VAE, 40000 tons of redispersible rubber powder, 40000 tons of PVB Resin, 40000 tons of PVB film, 12 million square meters of PVA optical film, 7 million square meters of polarizer and 4 million tons of cement clinker. Among them, the production and sales of PVA and high strength and high modulus PVA fiber have ranked first in the same industry in China for many years; PVB resin and film are at the forefront in China, and PVA optical film is the first in China.

Pva Resin Wanwei Brand,Pva 2488,Bp26 Pva,Pva Cleaning Mop

Henan Chuange Industry CO.,LTD , https://www.cgpvcresin.com