CO2 Welding Wire Production machine
WELDING WIRE DRAWING AND CUTTER MACHINE LINE
1-ROD WIRE PRETREATMENT(PAY OFF+DESCALER MACHINE+SAND BELT MACHINE)
2-ROUGH WIRE DRAWING MCHINE LZ560
3-HIGH SPEED STRAIGHTENER AND CUTTER MACHINE
4-THE FINISHED WIRE Φ2.50X350 Φ3.25X350 Φ4.0X450mm.
WE CAN MAKE THE WELDING WIRE ACCORDING TO THE BUYERS REQUIREMENTS
5.THE FIRST YEAR SERVICE INCLUDE THE SPAREPART IS FREELY SERVICE(BUT NOT INCLUDE THE BUYERS DELIBERATELY BREAKS THE MACHINE OR PARTS),THE SECOND AND THIRD YEAR JUST PAY THE PARTS COST.THE SELLER MUST OFFER THE LIFE-SERVICE FOR THE MACHINE LINE.
6.THE SELLER MUST GUARANTEE TO PRODUCE THE GOOD QUALITY FINISHED WELDING WIRE.
THE SELLER MUST OFFER THE ELECTRICITY MAP,TOUCH SCREEN,AND MANUAL BOOKS,MAINTAIN BOOKS,AND OTHER TECHNICAL DETAILS WITH ENGLISH.TRAIN THE BUYERS WORKERS TO MASTER THE MACHINE
7.SEA WORTHY PACKING, BIG MACHINES WRAPPED WITH PLASTIC NYLON, SMALL MACHINES AND PRECISION MACHINE MUST PACKED IN PLYWOOD BOXES THEN FIXED IN THE CONTAINER
LZ600 wire drawing machine
1. 1 Professional and technical personnel are required to carry out installation and commissioning. Before use, it is necessary to carefully read this manual and the relevant electrical instructions provided.
1. 2 Each machine and electric control cabinet shall be reliably grounded with a grounding resistance not more than 4Ω.
1. 3 There should be no accumulated water on the table top, especially near the operation box, as it can easily lead to circuit failure due to water infiltration.
1.4 It is prohibited for multiple people to operate the same equipment at the same time to avoid accidents.
1. 5 The electric control cabinet should be placed in a clean and dry room, and the door should be closed when working to prevent dust intrusion from causing device performance degradation or failure. Air conditioning is used to maintain the ambient temperature of the electric control cabinet. Frequently check the operation of the cooling fan on the top of the electric control cabinet.
1. 6 Before starting the machine, check whether the safety device is normal.
1. 7 Do not operate the components in the electrical cabinet with power. After cutting off the main power supply, wait at least five minutes, and wait until the intermediate circuit capacitance is discharged before operating the frequency converter, motor, or motor cable.
1.8 Do not touch the IC circuits on the inverter control interface board and motor control board, as static electricity may damage these circuits.
1.9 Please provide the power supply and operating environment according to the technical requirements of Section 3.2. It is not allowed to arbitrarily change the parameters of the frequency converter and PLC. The user shall be responsible for any damage to electrical components caused by human factors.
The second Delivery inspection
2. 1. Check whether the equipment is damaged and complete upon delivery (according to the packing list). If there is any damage or inconsistency with the contract, please contact the dealer or manufacturer immediately.
2. 2 The manufacturer is only responsible for quality issues arising during production, and is not responsible for damage caused during unpacking, improper installation and use, or damage caused by overload operation.
2. 3 After unpacking, the accompanying documents should be properly kept, as they are necessary during equipment installation, commissioning, and use.
CO2 welding Wire Production Line,Welding Wire Production Equipment Line,Production Line For Wire Barrel Packaging,Welding Wire Copper Plating Machinery=Proper(B10)
Jiangyin Wanyi Machinery CO.,Ltd , https://www.wydrawmachine.com