YLW series coal/biomass Thermal Oil Boiler adopts Square coil horizontal structure,chain grate automatic fuel feeding, FD/ID fan mechanical ventilation,slag remover for mechanical slag removing Coal Thermal Oil Boiler,Automatic Coal Fired Thermal Oil Boiler,Industrial Coal Fired Thermal Oil Boiler,Coal Fuel Thermal Oil Boiler,Thermal Oil Boiler Coal Fired Henan Yuanda Boiler Co., Ltd. , https://www.industrysboiler.com
while running,the burning fuel enter into the chain grate through the fuel hopper,then burn,The high-temperature flue gas is reflected to the front of the furnace by the rear arch and enters the furnace chamber. After radiation heat transfer by the radiation heating surface, it enters the convection heating surface for convection heat transfer.then enter into waste heat recovery boiler/air pre-heater, dust catcher, ID fan ,finally discharged into air by chimney
products features:
1. Multi-loop coil design
2. Countercurrent heat transfer process
3. Over oil temperature/over smoke temperature/low flow alarm
4. Set up air preheater, waste heat boiler
5. New "α" furnace arch
6. Advanced and scientific fabric technology
Haixin Heavy Industry successfully installed 900 tons of gantry crane
On February 1st, a 900-ton gantry crane of Haixin Heavy Industry Co., Ltd. was installed and the main project was fully put into operation in May.
It is reported that the gantry crane installed in place has an investment of more than 100 million yuan and a span of 226 meters, which is the largest in Nantong area and has a lifting height of 94 meters. The last four docking floors of the dock project will be completed by the end of April. Two of the four sub-segments of the hull have been completed and put into production, and the other two are completed in May. The entire project was completed in May and fully operational. According to reports, the company's orders this year have been full, there are two cutter suction boats, a piling boat, a crawling boat. At present, the company has 500 employees. The focus of the next project construction will be the introduction of equipment and the introduction of talents to ensure that the project will be fully operational after completion of the project and shorten the input and output period.