Night Vision Camera Parts,Night Vision Device Parts,Commercial Camera Parts,Industrial Camera Parts Ningbo Beilun Huasheng Mould Factory , https://www.huashengmoulds.com
Progress phase: preliminary design and construction period: 2011-2012 Major equipment: excavators, bulldozers, cranes, rollers, tamping machines, mixing towers, pavers, protective panels, explosion-proof blankets without magnetic probes, inspection wells, platoons Explosive tool vest, police equipment, bayonet, intelligent transportation, electronic police, snapping system, radar speed, green facilities, firefighting facilities, lighting facilities, drainage facilities, safety facilities.
Project Profile: The project is located in the Old City District of Lijiang City. The length of the reconstructed project road is 3.959km, the road red line is 33m wide, and the road grade is urban||grade main road. The design speed is 40km/h.
The total project investment is unknown.
Construction Unit: Lijiang Ancient City District Transportation Bureau Postal address: Kangzhong Road, Taihe West Road, Xianghe Belvedere, Gucheng District, Lijiang City Zip Code: 574100
Contact: Yang Yaoming Telephone: 0888-5156928
Fax: 0888-5156928
Liyong Highway (k3+000-k8+000) Reconstruction Project
Project Name: Laiyong Highway (k3+000-k8+000) Renovation Project (2011-2012, total project investment is unknown)
Related Developments: Tower Crane Infrastructure Project